{"product_id":"washer-electric-dryer-installation-side-by-side-pedestal-or-stack-configuration","title":"Washer \u0026 Electric Dryer Installation (Side‑by‑Side, Pedestal, or Stack Configuration)","description":"\u003cstyle\u003e\na {\n    text-decoration: none;\n    color: #464feb;\n}\ntr th, tr td {\n    border: 1px solid #e6e6e6;\n}\ntr th {\n    background-color: #f5f5f5;\n}\n\u003c\/style\u003e\n\u003cdiv\u003e\n\u003cp\u003eHave our professional installers safely and efficiently install your electric washer and dryer set using existing connections. Whether your units are installed side‑by‑side, stacked, or mounted on pedestals, this service ensures proper placement, secure connections, leveling, and full operational testing so your laundry appliances function exactly as intended.\u003cmeta content=\"text\/html; charset=us-ascii\" http-equiv=\"Content-Type\"\u003e\u003c\/p\u003e\n\u003c\/div\u003e\n\u003cstyle\u003e\na {\n    text-decoration: none;\n    color: #464feb;\n}\ntr th, tr td {\n    border: 1px solid #e6e6e6;\n}\ntr th {\n    background-color: #f5f5f5;\n}\n\u003c\/style\u003e\n\u003cdiv\u003e\n\u003cp\u003e\u003cstrong\u003eImportant – Select the Correct Installation Variant\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003ePricing and labour requirements vary based on installation configuration. Customers must select the correct installation variant at checkout:\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003e\u003cstrong\u003eSide‑by‑Side\u003c\/strong\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cstrong\u003ePedestals or Stacked\u003c\/strong\u003e\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003eSelecting the incorrect variant may result in additional charges, delays, or rescheduling to ensure proper staffing, equipment, and a safe installation.\u003cmeta content=\"text\/html; charset=us-ascii\" http-equiv=\"Content-Type\"\u003e\u003c\/p\u003e\n\u003c\/div\u003e\n\u003cstyle\u003e\na {\n    text-decoration: none;\n    color: #464feb;\n}\ntr th, tr td {\n    border: 1px solid #e6e6e6;\n}\ntr th {\n    background-color: #f5f5f5;\n}\n\u003c\/style\u003e\n\u003cdiv\u003e\n\u003cdiv\u003e\n\u003cdiv\u003e\n\u003cp\u003e\u003cstrong\u003eWhat’s Included\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eReview of installation details with the customer before work begins\u003c\/li\u003e\n\u003cli\u003eUnboxing and inspection of the washer and dryer for visible damage\u003c\/li\u003e\n\u003cli\u003eRemoval of shipping materials, including drum supports or shipping bolts where applicable\u003c\/li\u003e\n\u003cli\u003eDisconnecting existing appliances (if replacing an existing set)\u003c\/li\u003e\n\u003cli\u003ePositioning the washer and dryer based on the selected configuration\u003c\/li\u003e\n\u003cli\u003eStacking units or installing on pedestals using manufacturer‑approved hardware where applicable. Stacking kits and pedestals must be supplied by the customer and be compatible with the washer and dryer models being installed\u003c\/li\u003e\n\u003cli\u003eLeveling the washer and ensuring proper alignment of both units\u003c\/li\u003e\n\u003cli\u003eConnecting the washer to existing hot and cold water supply lines and drain\u003c\/li\u003e\n\u003cli\u003eConnecting the dryer to the existing electrical supply\u003c\/li\u003e\n\u003cli\u003eConnecting dryer venting to existing exhaust ducting (one standard vent connection)\u003c\/li\u003e\n\u003cli\u003eInstallation of anti‑tip bracket if supplied with the appliance and\/or required by the manufacturer\u003c\/li\u003e\n\u003cli\u003eEnsuring both appliances are properly grounded\u003c\/li\u003e\n\u003cli\u003eTesting full operation, including wash cycles, dryer heating, controls, and basic functionality\u003c\/li\u003e\n\u003cli\u003eFinal cleanup of the immediate work area, including breaking down installation packaging and placing materials aside for customer disposal\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003chr\u003e\n\u003cp\u003e\u003cstrong\u003eWhat’s Not Included\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eDisposal of old appliances or packaging\u003c\/li\u003e\n\u003cli\u003ePick‑up or delivery of appliances\u003c\/li\u003e\n\u003cli\u003eSupply of washer hoses or dryer venting materials\u003c\/li\u003e\n\u003cli\u003eInstallation or modification of water shut‑off valves\u003c\/li\u003e\n\u003cli\u003eElectrical upgrades, circuit changes, or running new wiring\u003c\/li\u003e\n\u003cli\u003eVenting modifications, extensions, or side‑vent conversions\u003c\/li\u003e\n\u003cli\u003eCabinetry modifications, structural changes, or reinforcement\u003c\/li\u003e\n\u003cli\u003eInstallation where existing plumbing, electrical, or venting is not code‑compliant\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003chr\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Disclaimer\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eThis service covers installation only using existing plumbing, electrical supply, venting, and appliance location. Any additional labour, plumbing work, electrical upgrades, venting modifications, or structural changes may require additional charges or a separate appointment. Pre‑existing conditions, such as damaged connections, insufficient electrical supply, improper venting, or clearance issues, may prevent installation from being completed. We reserve the right to decline or stop service if safety, accessibility, or code‑compliance issues are identified.\u003c\/p\u003e\n\u003c\/div\u003e\n\u003c\/div\u003e\n\u003c\/div\u003e","brand":"QuickTask - CAS","offers":[{"title":"Side by Side","offer_id":48764439724289,"sku":"LWEDSBS","price":155.08,"currency_code":"CAD","in_stock":true},{"title":"Pedestals or Stacked","offer_id":48764439757057,"sku":"LWEDPSTK","price":242.65,"currency_code":"CAD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0802\/8733\/4657\/files\/Washer_and_Dryer_Install_Service.png?v=1778677111","url":"https:\/\/cas.quicktask.com\/products\/washer-electric-dryer-installation-side-by-side-pedestal-or-stack-configuration","provider":"QuickTask - CAS","version":"1.0","type":"link"}