{"title":"Refrigerators","description":"\u003cstyle\u003e\na {\n    text-decoration: none;\n    color: #464feb;\n}\ntr th, tr td {\n    border: 1px solid #e6e6e6;\n}\ntr th {\n    background-color: #f5f5f5;\n}\n\u003c\/style\u003e\n\u003cdiv\u003eInstallation of refrigerators, including waterline connections where applicable, ensuring proper fit and functionality.\u003c\/div\u003e\n\u003cdiv\u003e\n\u003cbr\u003eQuickContractors is an independent service provider. Your installation service is purchased directly from QuickContractors, not Canadian Appliance Source (CAS). CAS assumes no liability for the installation services.\u003c\/div\u003e","products":[{"product_id":"fridge-waterline-connection-ice-maker-installation","title":"Fridge Waterline Connection \/ Ice Maker Installation","description":"\u003cstyle\u003e\na {\n    text-decoration: none;\n    color: #464feb;\n}\ntr th, tr td {\n    border: 1px solid #e6e6e6;\n}\ntr th {\n    background-color: #f5f5f5;\n}\n\u003c\/style\u003e\n\u003cdiv\u003eHave our professional installers safely and efficiently connect your refrigerator to an existing waterline. This service ensures proper connection to the existing water supply, leak testing, and full operational verification so your ice maker and\/or water dispenser function exactly as intended.\u003c\/div\u003e\n\u003cdiv\u003e\u003c\/div\u003e\n\u003cstyle\u003e\na {\n    text-decoration: none;\n    color: #464feb;\n}\ntr th, tr td {\n    border: 1px solid #e6e6e6;\n}\ntr th {\n    background-color: #f5f5f5;\n}\n\u003c\/style\u003e\n\u003cdiv\u003e\n\u003cdiv\u003e\n\u003ch2\u003eWhat’s Included\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003eReview of installation details and site conditions with the customer before work begins\u003c\/li\u003e\n\u003cli\u003eVerification that an existing, accessible, and functional water supply line and shut‑off valve are present and suitable for connection\u003c\/li\u003e\n\u003cli\u003eUnboxing and inspection of the refrigerator connection components (if applicable) for visible damage\u003c\/li\u003e\n\u003cli\u003eShutting off water supply and disconnecting any existing appliance connection, where applicable\u003c\/li\u003e\n\u003cli\u003eConnecting the refrigerator waterline and\/or icemaker kit to the existing water supply\u003c\/li\u003e\n\u003cli\u003eSecuring all tubing and fittings in accordance with manufacturer specifications and applicable plumbing standards\u003c\/li\u003e\n\u003cli\u003eTurning on the water supply and performing leak testing on all connections\u003c\/li\u003e\n\u003cli\u003ePurging air from the system and activating water\/ice functions as applicable\u003c\/li\u003e\n\u003cli\u003eEnsuring the refrigerator is repositioned and aligned within the installation space\u003c\/li\u003e\n\u003cli\u003eVerifying proper operation of the water dispenser and\/or ice maker\u003c\/li\u003e\n\u003cli\u003eFinal cleanup of the immediate work area, including breaking down installation packaging and placing materials aside for customer disposal\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003chr\u003e\n\u003ch2\u003eWhat’s Not Included\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003eInstallation of a new waterline or running waterlines through walls, ceilings, or cabinetry\u003c\/li\u003e\n\u003cli\u003eSupply or installation of a new water shut‑off valve\u003c\/li\u003e\n\u003cli\u003ePlumbing modifications, relocations, or extensions beyond the existing connection point\u003c\/li\u003e\n\u003cli\u003eInstallation of icemaker kits or components not provided with the appliance\u003c\/li\u003e\n\u003cli\u003eElectrical work or relocation of outlets\u003c\/li\u003e\n\u003cli\u003eCabinetry modifications, structural changes, or access modifications\u003c\/li\u003e\n\u003cli\u003eInstallation where existing plumbing is not accessible or not code‑compliant\u003c\/li\u003e\n\u003cli\u003eDisposal of packaging, old appliances, or debris\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003chr\u003e\n\u003ch2\u003eImportant Disclaimer\u003c\/h2\u003e\n\u003cp\u003eThis service assumes the presence of an existing, accessible, and functional water supply and shut‑off valve suitable for refrigerator connection. If a waterline or shut‑off valve is not present, improperly installed, or not code‑compliant, installation may not proceed and additional work or a separate service may be required. Any labour, plumbing modifications, or materials beyond what is expressly listed above may result in additional charges. All work is subject to site conditions, manufacturer requirements, and applicable plumbing standards, and service may be declined if conditions are deemed unsafe or unsuitable.\u003c\/p\u003e\n\u003c\/div\u003e\n\u003c\/div\u003e","brand":"QuickTask - CAS","offers":[{"title":"Default Title","offer_id":48766826414337,"sku":"FRGWLCON","price":164.57,"currency_code":"CAD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0802\/8733\/4657\/files\/Fridge_Waterline_Connection.png?v=1779202160"},{"product_id":"new-fridge-waterline-install-with-connection-includes-up-to-20ft","title":"New Fridge Waterline Install with Connection - Includes up to 20ft","description":"\u003cp class=\"MsoNormal\" style=\"margin: 0cm;\"\u003e\u003cspan style=\"mso-ansi-language: EN-CA;\"\u003eHave our professional installers safely and efficiently install a new waterline for your refrigerator and connect your appliance to a reliable water source. This service includes running a new water supply line (up to 20 ft), installing a shut‑off valve if required, and performing leak testing and operational verification so your refrigerator’s water and ice functions operate as intended.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoNormal\" style=\"margin: 0cm;\"\u003e\u003cspan style=\"mso-ansi-language: EN-CA;\"\u003e \u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoNormal\" style=\"margin: 0cm;\"\u003e\u003cb\u003e\u003cspan style=\"mso-ansi-language: EN-CA;\"\u003eWhat’s Included\u003c\/span\u003e\u003c\/b\u003e\u003c\/p\u003e\n\u003cul style=\"margin-top: 0cm;\" type=\"disc\"\u003e\n\u003cli class=\"MsoNormal\" style=\"margin-top: 0cm; margin-bottom: 0cm; mso-list: l1 level1 lfo1; tab-stops: list 36.0pt;\"\u003e\u003cspan style=\"mso-ansi-language: EN-CA;\"\u003eReview of installation details and site conditions with the customer before work begins\u003c\/span\u003e\u003c\/li\u003e\n\u003cli class=\"MsoNormal\" style=\"margin-top: 0cm; margin-bottom: 0cm; mso-list: l1 level1 lfo1; tab-stops: list 36.0pt;\"\u003e\u003cspan style=\"mso-ansi-language: EN-CA;\"\u003eVerification of suitable water source and installation pathway for the new waterline\u003c\/span\u003e\u003c\/li\u003e\n\u003cli class=\"MsoNormal\" style=\"margin-top: 0cm; margin-bottom: 0cm; mso-list: l1 level1 lfo1; tab-stops: list 36.0pt;\"\u003e\u003cspan style=\"mso-ansi-language: EN-CA;\"\u003eUnboxing and inspection of connection materials for visible defects (if applicable)\u003c\/span\u003e\u003c\/li\u003e\n\u003cli class=\"MsoNormal\" style=\"margin-top: 0cm; margin-bottom: 0cm; mso-list: l1 level1 lfo1; tab-stops: list 36.0pt;\"\u003e\u003cspan style=\"mso-ansi-language: EN-CA;\"\u003eShutting off water supply and preparing for installation\u003c\/span\u003e\u003c\/li\u003e\n\u003cli class=\"MsoNormal\" style=\"margin-top: 0cm; margin-bottom: 0cm; mso-list: l1 level1 lfo1; tab-stops: list 36.0pt;\"\u003e\u003cspan style=\"mso-ansi-language: EN-CA;\"\u003eSupply and installation of a new cold water supply line (up to 20 ft of 1\/4\" pex and fittings) from an existing plumbing source to the refrigerator location\u003c\/span\u003e\u003c\/li\u003e\n\u003cli class=\"MsoNormal\" style=\"margin-top: 0cm; margin-bottom: 0cm; mso-list: l1 level1 lfo1; tab-stops: list 36.0pt;\"\u003e\u003cspan style=\"mso-ansi-language: EN-CA;\"\u003eSupply and installation of a standard water shut‑off valve where required and accessible within the installation scope\u003c\/span\u003e\u003c\/li\u003e\n\u003cli class=\"MsoNormal\" style=\"margin-top: 0cm; margin-bottom: 0cm; mso-list: l1 level1 lfo1; tab-stops: list 36.0pt;\"\u003e\u003cspan style=\"mso-ansi-language: EN-CA;\"\u003eSecuring and routing of tubing in accordance with manufacturer recommendations and applicable plumbing standards\u003c\/span\u003e\u003c\/li\u003e\n\u003cli class=\"MsoNormal\" style=\"margin-top: 0cm; margin-bottom: 0cm; mso-list: l1 level1 lfo1; tab-stops: list 36.0pt;\"\u003e\u003cspan style=\"mso-ansi-language: EN-CA;\"\u003eConnecting the refrigerator to the newly installed waterline using manufacturer‑supplied components or compatible connection fittings\u003c\/span\u003e\u003c\/li\u003e\n\u003cli class=\"MsoNormal\" style=\"margin-top: 0cm; margin-bottom: 0cm; mso-list: l1 level1 lfo1; tab-stops: list 36.0pt;\"\u003e\u003cspan style=\"mso-ansi-language: EN-CA;\"\u003eTurning on water supply and performing leak testing on all connections\u003c\/span\u003e\u003c\/li\u003e\n\u003cli class=\"MsoNormal\" style=\"margin-top: 0cm; margin-bottom: 0cm; mso-list: l1 level1 lfo1; tab-stops: list 36.0pt;\"\u003e\u003cspan style=\"mso-ansi-language: EN-CA;\"\u003ePurging air from the system and activating water\/ice functions as applicable\u003c\/span\u003e\u003c\/li\u003e\n\u003cli class=\"MsoNormal\" style=\"margin-top: 0cm; margin-bottom: 0cm; mso-list: l1 level1 lfo1; tab-stops: list 36.0pt;\"\u003e\u003cspan style=\"mso-ansi-language: EN-CA;\"\u003ePositioning and aligning the refrigerator within the cabinetry or installation space\u003c\/span\u003e\u003c\/li\u003e\n\u003cli class=\"MsoNormal\" style=\"margin-top: 0cm; margin-bottom: 0cm; mso-list: l1 level1 lfo1; tab-stops: list 36.0pt;\"\u003e\u003cspan style=\"mso-ansi-language: EN-CA;\"\u003eVerifying proper operation of the water dispenser and\/or ice maker\u003c\/span\u003e\u003c\/li\u003e\n\u003cli class=\"MsoNormal\" style=\"margin-top: 0cm; margin-bottom: 0cm; mso-list: l1 level1 lfo1; tab-stops: list 36.0pt;\"\u003e\u003cspan style=\"mso-ansi-language: EN-CA;\"\u003eFinal cleanup of the immediate work area, including breaking down installation packaging and placing materials aside for customer disposal\u003c\/span\u003e\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cdiv class=\"MsoNormal\" align=\"center\" style=\"margin: 0cm; text-align: center;\"\u003e\u003chr size=\"2\" width=\"100%\" align=\"center\"\u003e\u003c\/div\u003e\n\u003cp class=\"MsoNormal\" style=\"margin: 0cm;\"\u003e\u003cb\u003e\u003cspan style=\"mso-ansi-language: EN-CA;\"\u003eWhat’s Not Included\u003c\/span\u003e\u003c\/b\u003e\u003c\/p\u003e\n\u003cul style=\"margin-top: 0cm;\" type=\"disc\"\u003e\n\u003cli class=\"MsoNormal\" style=\"margin-top: 0cm; margin-bottom: 0cm; mso-list: l0 level1 lfo2; tab-stops: list 36.0pt;\"\u003e\u003cspan style=\"mso-ansi-language: EN-CA;\"\u003eInstallation of waterlines exceeding 20 ft in length\u003c\/span\u003e\u003c\/li\u003e\n\u003cli class=\"MsoNormal\" style=\"margin-top: 0cm; margin-bottom: 0cm; mso-list: l0 level1 lfo2; tab-stops: list 36.0pt;\"\u003e\u003cspan style=\"mso-ansi-language: EN-CA;\"\u003eRunning waterlines through finished walls, ceilings, or enclosed spaces without accessible routing\u003c\/span\u003e\u003c\/li\u003e\n\u003cli class=\"MsoNormal\" style=\"margin-top: 0cm; margin-bottom: 0cm; mso-list: l0 level1 lfo2; tab-stops: list 36.0pt;\"\u003e\u003cspan style=\"mso-ansi-language: EN-CA;\"\u003ePlumbing modifications beyond the immediate connection point (e.g., major rerouting or structural access work)\u003c\/span\u003e\u003c\/li\u003e\n\u003cli class=\"MsoNormal\" style=\"margin-top: 0cm; margin-bottom: 0cm; mso-list: l0 level1 lfo2; tab-stops: list 36.0pt;\"\u003e\u003cspan style=\"mso-ansi-language: EN-CA;\"\u003eElectrical work or relocation of outlets\u003c\/span\u003e\u003c\/li\u003e\n\u003cli class=\"MsoNormal\" style=\"margin-top: 0cm; margin-bottom: 0cm; mso-list: l0 level1 lfo2; tab-stops: list 36.0pt;\"\u003e\u003cspan style=\"mso-ansi-language: EN-CA;\"\u003eCabinetry modifications, drilling through finished surfaces requiring patching, or structural changes\u003c\/span\u003e\u003c\/li\u003e\n\u003cli class=\"MsoNormal\" style=\"margin-top: 0cm; margin-bottom: 0cm; mso-list: l0 level1 lfo2; tab-stops: list 36.0pt;\"\u003e\u003cspan style=\"mso-ansi-language: EN-CA;\"\u003eInstallation of components not compatible with the appliance\u003c\/span\u003e\u003c\/li\u003e\n\u003cli class=\"MsoNormal\" style=\"margin-top: 0cm; margin-bottom: 0cm; mso-list: l0 level1 lfo2; tab-stops: list 36.0pt;\"\u003e\u003cspan style=\"mso-ansi-language: EN-CA;\"\u003eInstallation where access to the water source is restricted or not readily available\u003c\/span\u003e\u003c\/li\u003e\n\u003cli class=\"MsoNormal\" style=\"margin-top: 0cm; margin-bottom: 0cm; mso-list: l0 level1 lfo2; tab-stops: list 36.0pt;\"\u003e\u003cspan style=\"mso-ansi-language: EN-CA;\"\u003eDisposal of packaging, old appliances, or debris\u003c\/span\u003e\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cdiv class=\"MsoNormal\" align=\"center\" style=\"margin: 0cm; text-align: center;\"\u003e\u003chr size=\"2\" width=\"100%\" align=\"center\"\u003e\u003c\/div\u003e\n\u003cp class=\"MsoNormal\" style=\"margin: 0cm;\"\u003e\u003cb\u003e\u003cspan style=\"mso-ansi-language: EN-CA;\"\u003eImportant Disclaimer\u003c\/span\u003e\u003c\/b\u003e\u003c\/p\u003e\n\u003cp class=\"MsoNormal\" style=\"margin: 0cm;\"\u003e\u003cspan style=\"mso-ansi-language: EN-CA;\"\u003eThis service includes installation of a new waterline up to a maximum length of 20 ft and assumes accessible routing between the water source and refrigerator location. Installations requiring extended distances, concealed routing through finished structures, or significant plumbing modifications may require a revised scope of work and additional charges. All work is subject to site conditions, manufacturer requirements, and applicable plumbing standards. Service may be declined if access, safety, or code‑compliance conditions are not met.\u003c\/span\u003e\u003c\/p\u003e","brand":"QuickTask - CAS","offers":[{"title":"Default Title","offer_id":48766876811521,"sku":"FRGNEWLN","price":254.0,"currency_code":"CAD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0802\/8733\/4657\/files\/New_Fridge_Waterline_Install_2.png?v=1779204736"},{"product_id":"appliance-on-site-measure-quotation-service","title":"Appliance On Site Measure \/ Quotation Service","description":"\u003cstyle\u003e\na {\n    text-decoration: none;\n    color: #464feb;\n}\ntr th, tr td {\n    border: 1px solid #e6e6e6;\n}\ntr th {\n    background-color: #f5f5f5;\n}\n\u003c\/style\u003e\n\u003cdiv\u003e\n\u003cp\u003eA qualified installer will attend the customer’s location to assess the installation area and provide a detailed quote for the required work.\u003c\/p\u003e\n\u003ch3\u003e\u003cstrong\u003eThe service includes:\u003c\/strong\u003e\u003c\/h3\u003e\n\u003cul\u003e\n\u003cli\u003eMeasurement of the installation space to confirm appliance fit and sizing requirements\u003c\/li\u003e\n\u003cli\u003eReview of site conditions, access, and placement considerations\u003c\/li\u003e\n\u003cli\u003eIdentification of required installation scope based on the appliance type\u003c\/li\u003e\n\u003cli\u003eAssessment of visible electrical, gas, water, and ventilation connections (as applicable)\u003c\/li\u003e\n\u003cli\u003eDetermination of any additional trades, materials, or modifications required to complete the installation\u003c\/li\u003e\n\u003cli\u003eIdentification of applicable pre-priced installation packages, where available\u003c\/li\u003e\n\u003cli\u003eDocumentation of any site readiness requirements or work that must be completed prior to installation\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003eA formal quote will be provided outlining the recommended installation scope, required services, and associated costs.\u003c\/p\u003e\n\u003chr\u003e\n\u003ch3\u003e\u003cstrong\u003eImportant Notes \u0026amp; Disclaimers\u003c\/strong\u003e\u003c\/h3\u003e\n\u003cul\u003e\n\u003cli\u003eAssessment is based on\u003cstrong\u003e \u003c\/strong\u003evisible and accessible conditions only at the time of the visit\u003c\/li\u003e\n\u003cli\u003eAny concealed or unforeseen conditions may impact final scope and pricing\u003c\/li\u003e\n\u003cli\u003eThis service does not include installation or modifications\u003c\/li\u003e\n\u003cli\u003eCustomers are responsible for ensuring the area is accessible at the time of appointment\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003c\/div\u003e","brand":"QuickTask - CAS","offers":[{"title":"Electric Appliance","offer_id":48767171657985,"sku":"MEASELEC","price":105.49,"currency_code":"CAD","in_stock":true},{"title":"Gas Appliance","offer_id":48767171690753,"sku":"MEASGAS","price":105.49,"currency_code":"CAD","in_stock":true},{"title":"Dishwasher","offer_id":48767171723521,"sku":"MEASDW","price":105.49,"currency_code":"CAD","in_stock":true},{"title":"Rangehoods","offer_id":48767171756289,"sku":"MEASVENT","price":105.49,"currency_code":"CAD","in_stock":true},{"title":"Refrigerators \/ Waterlines","offer_id":48767171789057,"sku":"MEASFRGWL","price":105.49,"currency_code":"CAD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0802\/8733\/4657\/files\/Quotation_Service_for_Appliance.png?v=1778696888"},{"product_id":"water-electrical-appliance-disconnect-service-pre-delivery","title":"Water \u0026 Electrical - Appliance Disconnect Service – Pre‑Delivery","description":"\u003cstyle\u003e\na {\n    text-decoration: none;\n    color: #464feb;\n}\ntr th, tr td {\n    border: 1px solid #e6e6e6;\n}\ntr th {\n    background-color: #f5f5f5;\n}\n\u003c\/style\u003e\n\u003cdiv\u003e\n\u003cp\u003eSafely prepare your existing appliance for removal prior to the delivery of a new unit. Our professional installer will shut off and disconnect the water supply, safely disconnect electrical connections, and ensure the appliance is ready for removal without risk to your home.\u003c\/p\u003e\n\u003cp\u003eThis service is commonly required when a retailer’s delivery provider will deliver a new appliance and remove the existing one.\u003c\/p\u003e\n\u003ch2\u003eWhat’s Included\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003eReview of service details and site conditions with the customer before work begins\u003c\/li\u003e\n\u003cli\u003eService performed prior to the scheduled appliance delivery date\u003c\/li\u003e\n\u003cli\u003eInspection of existing water and electrical connections to ensure they can be safely disconnected\u003c\/li\u003e\n\u003cli\u003eShutting off water supply at the existing shut‑off valve\u003c\/li\u003e\n\u003cli\u003eVerifying that water is fully turned off prior to disconnection\u003c\/li\u003e\n\u003cli\u003eDisconnecting water supply lines or tubing from the appliance\u003c\/li\u003e\n\u003cli\u003eSecuring or capping water connections as required to prevent leaks\u003c\/li\u003e\n\u003cli\u003ePerforming a basic check to confirm there are no leaks at the connection point\u003c\/li\u003e\n\u003cli\u003eDisconnecting electrical supply and ensuring the appliance is safely unplugged\u003c\/li\u003e\n\u003cli\u003eLeaving the appliance in place for removal by the delivery provider\u003c\/li\u003e\n\u003cli\u003eFinal cleanup of the immediate work area\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003chr\u003e\n\u003ch2\u003eWhat’s Not Included\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003eRemoval or disposal of the appliance\u003c\/li\u003e\n\u003cli\u003eDelivery or installation of new appliances\u003c\/li\u003e\n\u003cli\u003eSupply or installation of a water shut‑off valve if one is not present\u003c\/li\u003e\n\u003cli\u003ePlumbing modifications, relocation, or extensions\u003c\/li\u003e\n\u003cli\u003eElectrical upgrades or relocation of outlets\u003c\/li\u003e\n\u003cli\u003eStructural changes or access modifications\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003chr\u003e\n\u003ch2\u003eImportant Disclaimer\u003c\/h2\u003e\n\u003cp\u003eThis service is for disconnection only and assumes the presence of an accessible and functional water shut‑off valve. If a shut‑off valve is not present or is not operational, additional work may be required and may be subject to additional charges or a separate service. Additional charges may also apply where site conditions prevent safe disconnection. All work is subject to site conditions, safety requirements, and applicable plumbing standards, and service may be declined if conditions are deemed unsafe or non‑compliant.\u003c\/p\u003e\n\u003c\/div\u003e","brand":"QuickTask - CAS","offers":[{"title":"Default Title","offer_id":48767816597761,"sku":"WEDISCON","price":130.81,"currency_code":"CAD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0802\/8733\/4657\/files\/Disconnection_Service_-_Water_and_Electrical.png?v=1779205512"}],"url":"https:\/\/cas.quicktask.com\/collections\/dishwasher-copy.oembed","provider":"QuickTask - CAS","version":"1.0","type":"link"}